Tuesday, 18 December 2012

ESSAY

Time fly fast, my 1st semester in USM is will be end soon. All the projects of Studio RUS 104 are came to the end. Along this semester, I had learnt something from the projects of RUS 104 whether in academic or non-academic. I know that every task given by the studio master have its own objectives.  

First of all, I had obtain some drawing skill from the studio's project. Although I still can't grasp these drawing skill, but at least I know what is these about in theory.Maybe is because that I have not talent in arts, so it might be very difficult for me to draw something nicely. However, I really appreciate what lecturers had teach to us.

Besides, I also learnt to how to work in a team. In a group discussion, there might be some argument on that particular project. But if we respect each other and having a good communication among the members, we could come to a agreement among the members in a short time. It is not an easy thing to work in a group. Every action we take should be considered other members.

In addition, in this Integrated Studio RUS 104, it really gives a chance for us to get well each other even from different major. This is because to complete a project, it needs the contribution from all the teamwork from all the major. The friendship is built up silently among us.

In conclusion, Integrated Studio RUS 104 really gives me a good memory in my life. I am very proud to be one of the member of RUS 104. I am not regret to join this studio. I think that it could be one of the wonderful experience for us as a HBP student.

Monday, 17 December 2012

PROJECT 10: XZBITION


The main purpose of this exhibition is to share our studio works . We have to exhibit the outcomes of the Project 1 to Project 9 . The venue of  this exhibition was held at the major spot of the HBP- THE DRUM.
The exhibitiion theme is COLOURFUL DOMINO.This exhibition was divided into 5 booths. We took 2 day to complete our decorations.It was a wonderful experience to be part of the member of this exhibition.

BOOTH 1 : PROJECT 1& ESQ


 BOOTH 1'S AREA


SELECTED STUDENT 'S LOGO



 SKETCHING  OF STUDENTS


 SELECTED STUDENTS' SELF PORTRAIT 


BOOTH2: PROJECT2 &3


 PROJECT 2A:AESTHETIC VIEW


  PROJECT 2A:AESTHETIC VIEW


 PROJECT 2B: DEFECT


 PROJECT 2B: DEFECT


 PROJECT 3A: NATURAL STRUCTURE 


 PROJECT 3A: NATURAL STRUCTURE


PROJECT3B: MAN-MADE STRUCTURE 


PROJECT3B: MAN-MADE STRUCTURE 



BOOTH 3: PROJECT 4 & 5

PROJECT 4: SCULPTURE


 PROJECT 4: SCULPTURE


 PROJECT5: BLUEPRINT


 PROJECT5: BLUEPRINT


BOOTH 4: PROJECT 6&7

 PROJECT 6: PROJECT DEVELOPMENT


  PROJECT 6: PROJECT DEVELOPMENT



 PROJECT 7: SKYWAY

 PROJECT 7: SKYWAY

BOOTH 5: PROJECT 8&9


 PROJECT 8 & 9


PRESENTATION BOARD  


 PRESENTATION BOARD  


 PRESENTATION BOARD


 PRESENTATION BOARD


 MODEL OF INFORMATION CENTRE


 MODEL OF INFORMATION CENTRE













PROJECT 9: INTEGRATED PROJECT


Project 9 is the  biggest project for Studio RUS104 that I had met. It was the continuous part of the Project 8. The site recommendation that made at project 8B was used to construct an information centre at Batu Ferringgi. This project consist of 3 part which are 9A, 9B and 9C.

For project 9A, we were asked to produce 4 presentation board.  


 1ST BOARD: SITE ANALYSIS OF THE PARTICULAR PROPOSE SITE


2ND BOARD : DESIGN PROPOSAL OF BATU FERRINGGI INFORMATION CENTRE


3RD BOARD: DESIGN PROPOSAL OF BATU FERRINGGI INFORMATION CENTRE


4TH BOARD : BUILDING MATERIALS AND SERVICES



While for project 9B, we need to produce a document proposal. We have to list out the purpose and objectives of this project. Besides, we have to provide the site analysis data for this proposed site.
The design concept of the building also have to be include into our report. Last but not least, the materials selected and services also need to be in our proposal for the cost calculating.


 PROPOSAL OF THE INFORMATION CENTRE



For Project 9C, we have to produce the model of the information centre with scale 1:100. We used the modelling board as the main materials of this model. We used a transparent plastic cover as our building windows.Below pictures show the view of our model from different angle.
 PLAN VIEW

FRONT VIEW

ENTRANCE OF THE BUILDING

AXONOMETRIC VIEW


 AXONOMETRIC VIEW


AXONOMETRIC VIEW

In conclusion, although the process of doing this project is very tough and stressful. But I am very happy to work with my friends. We had a good memory at Studio RUS 104.







PROJECT 8:(RE)VISITED






For this project 8, we were redistributed to a new group which the members were formed  different major. I was in group 5 and my group consist of 17 members. For this project, we were given a chance to have a one day trip at Batu Feringgi. The purpose of this trip is for the site analysis of this particular place. We had take a whole afternoon to do our site visit. Besides, we having a BBQ section at there. I think that that was a great chance for us to get well each other.


THE THAI RESTAURANT  AT BATU FERINGGI


THE SOUVENIR SHOP AT BATU FERRINGI


THE SOUVENIR SHOP AT BATU FERRINGI 


THE SHIP RESTAURANT


When we back to our studio, we start to plan our work. We need to produce two presentation board for this project in two A1 size board.For Project 8A, we were required to analysis about the community, facility& tourism activities at Batu Ferringi .While for Project 8B, we needed to analysis about the environment & spatial analysis.


PROJECT 8A
PROJECT 8A: SITE ANALYSIS -BATU FERRINGGI


FOOD & CLOTHES


TOURISM ACTIVITIES


CULTURAL ATTRACTION


WIND DIRECTION


SUN PATH


RAIN DATA


KEY PALN AND LOCATION PLAN



PROJECT 8B
PROJECT 8B: ENVIRONMENT &SPATIAL ANALYSIS

MAN-MADE FEATURES


SITE RECOMMENDATION


TRAFFIC & CIRCULATION +NOISE & AIR POLLUTION


SITE ANALYSIS


VEGETATION & BUFFER ZONE